Laying tips

Installation tips for our nets and "T" posts

Installation tips for our nets and "T" posts

Installation tips for our nets and "T" posts

1.

Prepare holes in the ground at regular intervals of approximately 2.0 ÷ 2.5 m using a guide wire and a level to lay the posts. The starting pole and the final pole must be equipped with reinforcing bars. In the presence of cantilevered or non-straight sections, we recommend installing other reinforcing bars, where necessary.

2.

Preparing the wire tensioner: Cut a piece of wire approximately 30 cm long. Insert one end into the thread tensioner hole and wrap it vigorously at least 3-4 times. The remaining part of the thread will be used to tie to the starting pole using the same technique. N.B. cut the excess part and hide the tips of the wire as much as possible to avoid accidental abrasions.

3.

The tension wire is tied to the final pole by means of another strong binding and will pass through all the poles in the appropriate holes, anchoring itself to the previously blocked wire guide (as shown in the figure) which will tension everything. N.B. The wire tensioners must be tightened gradually only when the entire structure is completed.

Inserimento del filo

Tensione del filo

4.

The net will be placed vertically on the starting pole and tied with thin threads in several points and gradually unrolled and tied to the tension threads at regular intervals.

Find out more

See the full range of our products

See the products